The World Bank

Senior Project Engineer for Phase I—demolition of two buildings and erection of a new 450,000 SF building; Phase II—demolition of two buildings and erection of 750,000 SF building; Phase III—retrofit 850,000 SF existing building on a 3.4 acre urban site.

WORLD WAR II MEMORIAL

Assistant Project Manager for both design phase and construction phase management of this national memorial which is located at the ease end of the Reflecting Pool on The Mall, between the Lincoln Memorial and the Washington Monument. Pre-construction phase services were extensive and included budgeting and cost estimating, Value Engineering, site planning and logistics, design and constructability reviews, phasing and sequencing development, and cash flow analysis. The fundraising campaign raised more than $150 million.

NATIONAL CHURCH OF GOD

Development Coordinator responsible for the program development in the conversion of an existing 80,000 SF school to the Senior Citizen congregate care facility. Responsible for the coordination with a local developer in defining the Community Development program, liaison with the local politicians and county development officials. Responsible for the development of the project schedule and budget and preparation of the tax credit application for the development.

We use cookies to improve your experience and to help us understand how you use our site. Please refer to our cookie notice and privacy statement for more information regarding cookies and other third-party tracking that may be enabled.

Address: 4806 St. Barnabas Road, Suite 1607, Temple Hills, MD  20757
Phone: 301-200-2396
Email us at info@nehemiahgrp.com

Contact us for a free 30 minute appointment to talk about your project.

© 2023 The Nehemiah Group, LLC

Facebook icon
Instagram icon
LinkedIn icon
Intuit Mailchimp logo